Stabilized construction entrance

$3,215.07 / EA

EW-010 · MasterFormat 31 25 13 · EA

What’s in this rate

This unit covers Stabilized construction entrance, measured per each. The crew lays geotextile and places and spreads a 12-inch crushed-stone pad at the site exit. The rate covers the listed material, labor, and small tools. Top-dressing, wheel wash, street sweeping, and SWPPP maintenance stay on their own units.

Includes

  • nonwoven geotextile ~1,000 SF
  • 2–3 in crushed stone 12 in thick (~20x50 ft)
  • loader placement and spreading
  • operator and laborer time and equipment listed in the build-up
  • stated material waste and small tools

Excludes

  • SWPPP plan preparation, inspections, reporting, and permit fees
  • maintenance, sediment cleanout, and removal at project end
  • wheel-wash rack / rumble plates
  • street sweeping
  • stone top-dressing over the job
  • tax / freight beyond the stated delivered material prices
  • after-hours, premium access, and contaminated / hazardous soil handling
  • geotechnical testing, surveying / staking, and permits

Build-up

Operator, 3 hr × $52.00
$156.00
Laborer, 4 hr × $38.00
$152.00
Material and small tools
$2,019.08
Equipment, wheel loader ~3 CY class, 3 hr per unit
$330.00
Direct rate (labor, material, equipment, and tools)
$2,657.08 / EA
Overhead 10% of direct
$265.71
Fee 10% of (direct and overhead)
$292.28
Loaded rate
$3,215.07 / EA

Worked extension: 1 EA of commercial stabilized construction entrance × $3,215.07 = $3,215.07 loaded for 1 EA. Quantity is a worked extension.