Limestone coping

$80.16 / LF

MS-D2-028 · MasterFormat 04 40 00 · LF

What’s in this rate

This unit covers Limestone coping, measured per linear foot. The bricklayer sets natural limestone coping with bedding mortar and joint tooling. The rate covers the listed material, 5.00% material waste, labor, and small tools. cast-stone coping, stone-coping-masonry, brick coping, coping-metal-cap / parapet-coping / roof-coping-* are separate units.

Includes

  • natural limestone coping units
  • setting mortar / bedding
  • joint tooling and sealant allocation light
  • layout and installation described above
  • stated material waste and small tools

Excludes

  • cast-stone coping
  • stone-coping-masonry
  • brick coping
  • coping-metal-cap / parapet-coping / roof-coping-*
  • tax / freight
  • after-hours, premium access, and hazardous-material handling

Build-up

Labor 0.5 hr × $52.00 wage and burden
$26.00
Material and small tools
$40.25
Direct rate (labor, material, and tools)
$66.25 / LF
Overhead 10% of direct
$6.62
Fee 10% of (direct and overhead)
$7.29
Loaded rate
$80.16 / LF

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.