Limestone coping
$80.16 / LF
MS-D2-028 · MasterFormat 04 40 00 · LF
What’s in this rate
This unit covers Limestone coping, measured per linear foot. The bricklayer sets natural limestone coping with bedding mortar and joint tooling. The rate covers the listed material, 5.00% material waste, labor, and small tools. cast-stone coping, stone-coping-masonry, brick coping, coping-metal-cap / parapet-coping / roof-coping-* are separate units.
Includes
- natural limestone coping units
- setting mortar / bedding
- joint tooling and sealant allocation light
- layout and installation described above
- stated material waste and small tools
Excludes
- cast-stone coping
- stone-coping-masonry
- brick coping
- coping-metal-cap / parapet-coping / roof-coping-*
- tax / freight
- after-hours, premium access, and hazardous-material handling
Build-up
- Labor 0.5 hr × $52.00 wage and burden
- $26.00
- Material and small tools
- $40.25
- Direct rate (labor, material, and tools)
- $66.25 / LF
- Overhead 10% of direct
- $6.62
- Fee 10% of (direct and overhead)
- $7.29
- Loaded rate
- $80.16 / LF
Related rates
Use this in a private library
Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.
