Masonry storefront buck
$135.04 / EA
MS-D2-032 · MasterFormat 04 05 23 · EA
What’s in this rate
This unit covers Masonry storefront buck, measured per each. The bricklayer builds a masonry buck for a storefront opening plumb and square. The rate covers the listed material, 5.00% material waste, labor, and small tools. masonry door buck, masonry window buck, masonry louver buck, storefront framing install are separate units.
Includes
- buck / frame build-out materials in masonry storefront opening
- mortar and fasteners allocation
- layout plumb/square
- layout and installation described above
- stated material waste and small tools
Excludes
- masonry-door-buck
- masonry-window-buck
- masonry-louver-buck
- storefront framing install
- tax / freight
- after-hours, premium access, and hazardous-material handling
Build-up
- Labor 1.4 hr × $52.00 wage and burden
- $72.80
- Material and small tools
- $38.80
- Direct rate (labor, material, and tools)
- $111.60 / EA
- Overhead 10% of direct
- $11.16
- Fee 10% of (direct and overhead)
- $12.28
- Loaded rate
- $135.04 / EA
Related rates
Use this in a private library
Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.
