TPO expansion joint cover

$30.16 / LF

TPO expansion joint cover · MasterFormat 07 95 13 · LF

What’s in this rate

This unit is installing a factory-made TPO-faced expansion joint cover in a straight roof-to-roof run. The crew aligns the cover over the prepared joint, fastens or positions the assembly as specified, and heat-welds the TPO flanges to the field membrane. The rate is per linear foot. Curbs, transitions, factory intersections, structural joint work, and insulation are separate items. The rate covers the straight run only. Factory intersections and wide or seismic bellows are priced separately.

Includes

  • 60-mil, 6-inch factory TPO expansion-joint cover
  • Straight-run layout and heat-welded flanges
  • Standard cuts and cleanup
  • Small tools

Excludes

  • Intersections and corners
  • Roof-to-wall shapes
  • Structural joint repair
  • Insulation
  • Field membrane replacement

Build-up

Labor 0.25 hr × $65.00 wage and burden
$16.25
Material and small tools
$8.68
Direct rate (labor, material, and tools)
$24.93 / LF
Overhead 10% of direct
$2.49
Fee 10% of (direct and overhead)
$2.74
Loaded rate
$30.16 / LF

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.