Fiber roll (wattle), 9 in

$3.60 / LF

EW-007 · MasterFormat 31 25 13 · LF

What’s in this rate

This unit covers Fiber roll (wattle), 9 in, measured per linear foot. The laborer trenches in and stakes a 9-inch fiber roll along the contour or slope toe. The rate covers the listed material, labor, and small tools. Silt fence, inlet protection, and SWPPP inspection / maintenance stay on their own units.

Includes

  • 9 in straw/coir fiber roll
  • shallow trench 2–3 in
  • wood stakes at ~4 ft
  • operator and laborer time and equipment listed in the build-up
  • stated material waste and small tools

Excludes

  • SWPPP plan preparation, inspections, reporting, and permit fees
  • maintenance, sediment cleanout, and removal at project end
  • tax / freight beyond the stated delivered material prices
  • after-hours, premium access, and contaminated / hazardous soil handling
  • geotechnical testing, surveying / staking, and permits

Build-up

Laborer, 0.02 hr × $38.00
$0.76
Material and small tools
$2.21
Direct rate (labor, material, and tools)
$2.97 / LF
Overhead 10% of direct
$0.30
Fee 10% of (direct and overhead)
$0.33
Loaded rate
$3.60 / LF

Worked extension: 1,000 LF of commercial fiber roll (wattle), 9 in × $3.60 = $3,600.00 loaded for 1,000 LF. Quantity is a worked extension.

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.