Fiber roll (wattle), 9 in
$3.60 / LF
EW-007 · MasterFormat 31 25 13 · LF
What’s in this rate
This unit covers Fiber roll (wattle), 9 in, measured per linear foot. The laborer trenches in and stakes a 9-inch fiber roll along the contour or slope toe. The rate covers the listed material, labor, and small tools. Silt fence, inlet protection, and SWPPP inspection / maintenance stay on their own units.
Includes
- 9 in straw/coir fiber roll
- shallow trench 2–3 in
- wood stakes at ~4 ft
- operator and laborer time and equipment listed in the build-up
- stated material waste and small tools
Excludes
- SWPPP plan preparation, inspections, reporting, and permit fees
- maintenance, sediment cleanout, and removal at project end
- tax / freight beyond the stated delivered material prices
- after-hours, premium access, and contaminated / hazardous soil handling
- geotechnical testing, surveying / staking, and permits
Build-up
- Laborer, 0.02 hr × $38.00
- $0.76
- Material and small tools
- $2.21
- Direct rate (labor, material, and tools)
- $2.97 / LF
- Overhead 10% of direct
- $0.30
- Fee 10% of (direct and overhead)
- $0.33
- Loaded rate
- $3.60 / LF
Worked extension: 1,000 LF of commercial fiber roll (wattle), 9 in × $3.60 = $3,600.00 loaded for 1,000 LF. Quantity is a worked extension.
Related rates
Use this in a private library
Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.
