Fiber roll (wattle), 9 in
$3.67 / LF
Fiber roll (wattle), 9 in costs about $3.67 per linear foot installed. This is a published starting point and varies by region and job.
EW-007 · MasterFormat 31 25 13 · LF
What’s in this rate
This unit covers Fiber roll (wattle), 9 in, measured per linear foot. The laborer trenches in and stakes a 9-inch fiber roll along the contour or slope toe. The rate covers the listed material, labor, and small tools. Silt fence, inlet protection, and SWPPP inspection / maintenance stay on their own units.
Includes
- 9 in straw/coir fiber roll
- shallow trench 2–3 in
- wood stakes at ~4 ft
- operator and laborer time and equipment listed in the build-up
- stated material waste and small tools
Excludes
- SWPPP plan preparation, inspections, reporting, and permit fees
- maintenance, sediment cleanout, and removal at project end
- tax / freight beyond the stated delivered material prices
- after-hours, premium access, and contaminated / hazardous soil handling
- geotechnical testing, surveying / staking, and permits
Build-up
- Laborer, 0.02 hr × $41.00
- $0.82
- Material and small tools
- $2.21
- Direct rate (labor, material, and tools)
- $3.03 / LF
- Overhead 10% of direct
- $0.30
- Fee 10% of (direct and overhead)
- $0.34
- Loaded rate
- $3.67 / LF
Worked extension: 1,000 LF of commercial fiber roll (wattle), 9 in × $3.67 = $3,670.00 loaded for 1,000 LF. Quantity is a worked extension.
Related rates
- Silt fence, wire-backed — $3.99 / LF
- Inlet protection, grate inlet — $85.20 / EA
- Erosion control blanket — $0.29 / SF
- Concrete washout container, prefabricated 6 ft x 6 ft — $260.51 / EA
- Concrete washout container, prefabricated 4 ft x 4 ft — $164.71 / EA
- Stabilized construction entrance — $3,233.22 / EA
- Rock check dam — $229.82 / EA
- Inlet protection, curb inlet — $70.85 / EA
Use this in a private library
Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.
