Dozer cut to fill, 100 ft push

$1.56 / CY

Dozer cut to fill, 100 ft push costs about $1.56 per cubic yard installed. This is a published starting point and varies by region and job.

EW-065 · MasterFormat 31 22 13 · CY

What’s in this rate

This unit covers dozer cut to fill, 100 ft push, measured per cubic yard. The operator cuts high ground with a crawler dozer and pushes it up to 100 feet into the fill area, with a laborer checking grade. The rate covers the listed material, labor, and small tools. Compaction, fine grading, and hauling stay on their own units.

Includes

  • dozer cut and push ≤100 ft
  • spread in fill area
  • grade checking
  • operator and laborer time and equipment listed in the build-up
  • stated material waste and small tools

Excludes

  • compaction (earthwork-*-fill-*-lift)
  • fine grading
  • truck haul (earthwork-haul-*)
  • rock ripping
  • sales tax; freight beyond what the build-up states
  • after-hours, premium access, and contaminated / hazardous soil handling
  • geotechnical testing, surveying / staking, and permits

Build-up

Operator, 0.0066667 hr × $53.00
$0.35
Laborer, 0.0016667 hr × $41.00
$0.07
Material and small tools
$0.00
Equipment, crawler dozer ~D6 class, 0.0066667 hr per unit
$0.87
Direct rate (labor, material, equipment, and tools)
$1.29 / CY
Overhead 10% of direct
$0.13
Fee 10% of (direct and overhead)
$0.14
Loaded rate
$1.56 / CY

Worked extension: 100 CY of commercial dozer cut to fill, 100 ft push × $1.56 = $156.00 loaded for 100 CY. Quantity is a worked extension.

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.