Structural fill, 12 in lifts
$2.89 / CY
EW-035 · MasterFormat 31 23 23 · CY
What’s in this rate
This unit covers Structural fill, 12 in lifts, measured per cubic yard. The operator spreads fill in 12-inch lifts, moisture-conditions it, and compacts it with a vibratory roller. The rate covers the listed material, labor, and small tools. Fill material, testing, and thinner-lift placement stay on their own units.
Includes
- spread in 12 in loose lifts
- moisture condition
- sourced water at the utility volumetric rate
- vibratory roller compaction
- operator and laborer time and equipment listed in the build-up
- stated material waste and small tools
Excludes
- fill material (earthwork-import-*)
- compaction testing
- fine grading
- tax / freight beyond the stated delivered material prices
- after-hours, premium access, and contaminated / hazardous soil handling
- geotechnical testing, surveying / staking, and permits
- hydrant meter set and monthly fees
Build-up
- Operator, 0.014 hr × $52.00
- $0.73
- Laborer, 0.004 hr × $38.00
- $0.15
- Water
- Portland Water District volumetric rate, $0.11 per CY
- Material and small tools
- $0.12
- Equipment, crawler dozer ~D6 class, 0.005 hr per unit
- $0.65
- Equipment, smooth-drum vibratory roller ~84 in class, 0.0065 hr per unit
- $0.55
- Equipment, water truck ~2,000–4,000 gal (driven by Operator), 0.0025 hr per unit
- $0.19
- Direct rate (labor, material, equipment, and tools)
- $2.39 / CY
- Overhead 10% of direct
- $0.24
- Fee 10% of (direct and overhead)
- $0.26
- Loaded rate
- $2.89 / CY
Worked extension: 100 CY of commercial structural fill, 12 in lifts × $2.89 = $289.00 loaded for 100 CY. Quantity is a worked extension.
Related rates
Use this in a private library
Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.
