Dozer cut to fill, 200 ft push
$2.12 / CY
EW-066 · MasterFormat 31 22 13 · CY
What’s in this rate
This unit covers dozer cut to fill, 200 ft push, measured per cubic yard. The operator cuts high ground with a crawler dozer and pushes it up to 200 feet into the fill area, with a laborer checking grade. The rate covers the listed material, labor, and small tools. Compaction, fine grading, and hauling stay on their own units.
Includes
- dozer cut and push ≤200 ft
- spread in fill area
- grade checking
- operator and laborer time and equipment listed in the build-up
- stated material waste and small tools
Excludes
- compaction
- fine grading
- truck haul
- rock ripping
- sales tax; freight beyond what the build-up states
- after-hours, premium access, and contaminated / hazardous soil handling
- geotechnical testing, surveying / staking, and permits
Build-up
- Operator, 0.0090909 hr × $52.00
- $0.47
- Laborer, 0.0022727 hr × $38.00
- $0.09
- Material and small tools
- $0.01
- Equipment, crawler dozer ~D6 class, 0.0090909 hr per unit
- $1.18
- Direct rate (labor, material, equipment, and tools)
- $1.75 / CY
- Overhead 10% of direct
- $0.18
- Fee 10% of (direct and overhead)
- $0.19
- Loaded rate
- $2.12 / CY
Worked extension: 100 CY of commercial dozer cut to fill, 200 ft push × $2.12 = $212.00 loaded for 100 CY. Quantity is a worked extension.
Related rates
Use this in a private library
Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.
