Common fill, place and compact, 18 in lifts

$1.75 / CY

EW-064 · MasterFormat 31 23 23 · CY

What’s in this rate

This unit covers common fill, place and compact, 18 in lifts, measured per cubic yard. The operator spreads common fill in 18-inch lifts, adds water as needed, and compacts it with a roller to a non-structural density. The rate covers the listed material, sourced water, labor, and small tools. Fill material, compaction testing, and structural fill stay on their own units.

Includes

  • spread in 18 in loose lifts
  • sourced water at the utility volumetric rate
  • moisture condition (water-truck time)
  • roller compaction to ~90% standard Proctor
  • operator and laborer time and equipment listed in the build-up
  • stated material waste and small tools

Excludes

  • fill material
  • sourced water at the utility volumetric rate
  • hydrant meter set and monthly fees
  • compaction testing
  • structural compaction
  • sales tax; freight beyond what the build-up states
  • after-hours, premium access, and contaminated / hazardous soil handling
  • geotechnical testing, surveying / staking, and permits

Build-up

Operator, 0.008 hr × $52.00
$0.42
Laborer, 0.0025 hr × $38.00
$0.09
Water
Portland Water District volumetric rate, $0.11 per CY
Material and small tools
$0.12
Equipment, crawler dozer ~D6 class, 0.0035 hr per unit
$0.46
Equipment, smooth-drum vibratory roller ~84 in class, 0.003 hr per unit
$0.25
Equipment, water truck ~2,000–4,000 gal (driven by Operator), 0.0015 hr per unit
$0.11
Direct rate (labor, material, equipment, and tools)
$1.45 / CY
Overhead 10% of direct
$0.14
Fee 10% of (direct and overhead)
$0.16
Loaded rate
$1.75 / CY

Worked extension: 100 CY of commercial common fill, place and compact, 18 in lifts × $1.75 = $175.00 loaded for 100 CY. Quantity is a worked extension.

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.