Structural fill, 6 in lifts

$4.85 / CY

EW-037 · MasterFormat 31 23 23 · CY

What’s in this rate

This unit covers Structural fill, 6 in lifts, measured per cubic yard. The operator spreads fill in 6-inch lifts, moisture-conditions it, and compacts it with a vibratory roller. The rate covers the listed material, labor, and small tools. Fill material, testing, and thicker-lift placement stay on their own units.

Includes

  • spread in 6 in loose lifts
  • moisture condition
  • sourced water at the utility volumetric rate
  • vibratory roller compaction
  • operator and laborer time and equipment listed in the build-up
  • stated material waste and small tools

Excludes

  • fill material
  • compaction testing
  • fine grading
  • tax / freight beyond the stated delivered material prices
  • after-hours, premium access, and contaminated / hazardous soil handling
  • geotechnical testing, surveying / staking, and permits
  • hydrant meter set and monthly fees

Build-up

Operator, 0.0245 hr × $52.00
$1.27
Laborer, 0.006 hr × $38.00
$0.23
Water
Portland Water District volumetric rate, $0.11 per CY
Material and small tools
$0.13
Equipment, crawler dozer ~D6 class, 0.0075 hr per unit
$0.98
Equipment, smooth-drum vibratory roller ~84 in class, 0.0135 hr per unit
$1.14
Equipment, water truck ~2,000–4,000 gal (driven by Operator), 0.0035 hr per unit
$0.26
Direct rate (labor, material, equipment, and tools)
$4.01 / CY
Overhead 10% of direct
$0.40
Fee 10% of (direct and overhead)
$0.44
Loaded rate
$4.85 / CY

Worked extension: 100 CY of commercial structural fill, 6 in lifts × $4.85 = $485.00 loaded for 100 CY. Quantity is a worked extension.

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.