Structural fill, 8 in lifts

$3.83 / CY

EW-036 · MasterFormat 31 23 23 · CY

What’s in this rate

This unit covers Structural fill, 8 in lifts, measured per cubic yard. The operator spreads fill in 8-inch lifts, moisture-conditions it, and compacts it with a vibratory roller. The rate covers the listed material, labor, and small tools. Fill material, testing, and other lift thicknesses stay on their own units.

Includes

  • spread in 8 in loose lifts
  • moisture condition
  • sourced water at the utility volumetric rate
  • vibratory roller compaction
  • operator and laborer time and equipment listed in the build-up
  • stated material waste and small tools

Excludes

  • fill material
  • compaction testing
  • fine grading
  • tax / freight beyond the stated delivered material prices
  • after-hours, premium access, and contaminated / hazardous soil handling
  • geotechnical testing, surveying / staking, and permits
  • hydrant meter set and monthly fees

Build-up

Operator, 0.019 hr × $52.00
$0.99
Laborer, 0.005 hr × $38.00
$0.19
Water
Portland Water District volumetric rate, $0.11 per CY
Material and small tools
$0.12
Equipment, crawler dozer ~D6 class, 0.006 hr per unit
$0.78
Equipment, smooth-drum vibratory roller ~84 in class, 0.01 hr per unit
$0.86
Equipment, water truck ~2,000–4,000 gal (driven by Operator), 0.003 hr per unit
$0.22
Direct rate (labor, material, equipment, and tools)
$3.16 / CY
Overhead 10% of direct
$0.32
Fee 10% of (direct and overhead)
$0.35
Loaded rate
$3.83 / CY

Worked extension: 100 CY of commercial structural fill, 8 in lifts × $3.83 = $383.00 loaded for 100 CY. Quantity is a worked extension.

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.