Concrete unit rates
Page 5 of 5
Published concrete flatwork unit rates: slabs, sidewalks, curb and gutter, patch, rebar, sealer, and pads. Each page is one unit with a loaded price.
Also see electrical unit rates, low-voltage unit rates, roofing unit rates, drywall unit rates, painting unit rates, flooring unit rates, plumbing unit rates, HVAC unit rates, fire protection unit rates, masonry unit rates, structural steel unit rates, and earthwork unit rates.
- Strip footing pour$25.18 / CFIncludes 10% overhead and 10% fee
- Threaded rebar coupler$16.46 / EAIncludes 10% overhead and 10% fee
- Tilt panel grout$7.48 / LFIncludes 10% overhead and 10% fee
- Tilt-panel brace$17.34 / EAIncludes 10% overhead and 10% fee
- Tilt-panel brace insert$14.55 / EAIncludes 10% overhead and 10% fee
- Tilt-panel embed plate$15.71 / EAIncludes 10% overhead and 10% fee
- Tilt-panel weld plate$15.58 / EAIncludes 10% overhead and 10% fee
- Transformer pad$210.78 / EAIncludes 10% overhead and 10% fee
- Trench drain channel$48.72 / LFIncludes 10% overhead and 10% fee
- Trench drain form$14.65 / LFIncludes 10% overhead and 10% fee
- Trench drain form and place$31.45 / LFIncludes 10% overhead and 10% fee
- Trench drain frame-and-grate$18.34 / LFIncludes 10% overhead and 10% fee
- Trench drain grate frame$12.37 / LFIncludes 10% overhead and 10% fee
- Trench drain grate set$17.40 / LFIncludes 10% overhead and 10% fee
- Trench drain place$20.31 / LFIncludes 10% overhead and 10% fee
- Trench footing place$23.76 / CFIncludes 10% overhead and 10% fee
- Two-sided wall form$15.84 / SFIncludes 10% overhead and 10% fee
- Under-slab vapor barrier$0.76 / SFIncludes 10% overhead and 10% fee
- Vapor barrier 15-mil under slab$1.35 / SFIncludes 10% overhead and 10% fee
- Void form place$5.20 / SFIncludes 10% overhead and 10% fee
- Wall form & place$17.20 / SFIncludes 10% overhead and 10% fee
- Wall void form$8.18 / SFIncludes 10% overhead and 10% fee
- Wash-rack housekeeping pad$17.67 / SFIncludes 10% overhead and 10% fee
- Wash-rack pad$14.32 / SFIncludes 10% overhead and 10% fee
- Wheelchair ramp landing pad$8.58 / SFIncludes 10% overhead and 10% fee
- Wheelchair ramp place$10.66 / SFIncludes 10% overhead and 10% fee
- Wire mesh place$1.73 / SFIncludes 10% overhead and 10% fee