Concrete unit rates
Page 3 of 5
Published concrete flatwork unit rates: slabs, sidewalks, curb and gutter, patch, rebar, sealer, and pads. Each page is one unit with a loaded price.
Also see electrical unit rates, low-voltage unit rates, roofing unit rates, drywall unit rates, painting unit rates, flooring unit rates, plumbing unit rates, HVAC unit rates, fire protection unit rates, masonry unit rates, structural steel unit rates, and earthwork unit rates.
- Housekeeping equipment pad$148.58 / EAIncludes 10% overhead and 10% fee
- Hydrodemolition prep$5.60 / SFIncludes 10% overhead and 10% fee
- Hydrophilic waterstop$7.67 / LFIncludes 10% overhead and 10% fee
- Injectable hose waterstop$11.04 / LFIncludes 10% overhead and 10% fee
- Injectable waterstop$11.11 / LFIncludes 10% overhead and 10% fee
- Install #4 rebar (slab)$2.62 / SFIncludes 10% overhead and 10% fee
- Install #5 rebar (slab)$3.16 / SFIncludes 10% overhead and 10% fee
- Install concrete-set bollard$243.68 / EAIncludes 10% overhead and 10% fee
- Install welded wire mesh$1.42 / SFIncludes 10% overhead and 10% fee
- Integral color concrete finish$2.95 / SFIncludes 10% overhead and 10% fee
- Integral topping$4.30 / SFIncludes 10% overhead and 10% fee
- Isolated equipment pad$12.62 / SFIncludes 10% overhead and 10% fee
- Isolated spread footing$25.73 / CFIncludes 10% overhead and 10% fee
- Isolation joint seal$7.61 / LFIncludes 10% overhead and 10% fee
- Keyway construction joint form$8.11 / LFIncludes 10% overhead and 10% fee
- Labyrinth PVC waterstop$9.11 / LFIncludes 10% overhead and 10% fee
- Lean concrete fill$12.27 / CFIncludes 10% overhead and 10% fee
- Leveler pit wall form$16.94 / SFIncludes 10% overhead and 10% fee
- Light pole base$185.71 / EAIncludes 10% overhead and 10% fee
- Lintel pour$11.09 / LFIncludes 10% overhead and 10% fee
- Loading dock apron$12.13 / SFIncludes 10% overhead and 10% fee
- Loading dock leveler pit$778.38 / EAIncludes 10% overhead and 10% fee
- Loading dock wall$19.16 / SFIncludes 10% overhead and 10% fee
- Machine base place$171.07 / EAIncludes 10% overhead and 10% fee
- Mat foundation place$22.01 / CFIncludes 10% overhead and 10% fee
- Mat foundation pour$24.95 / CFIncludes 10% overhead and 10% fee
- Mat slab place$9.95 / SFIncludes 10% overhead and 10% fee
- Mechanical rebar coupler$16.07 / EAIncludes 10% overhead and 10% fee
- Mechanical rebar dowel$17.94 / EAIncludes 10% overhead and 10% fee
- Mechanical rebar splice$16.37 / EAIncludes 10% overhead and 10% fee
- Medium broom-finish plaza$6.09 / SFIncludes 10% overhead and 10% fee
- Metal pan deck fill$7.07 / SFIncludes 10% overhead and 10% fee
- Monolithic curb$21.08 / LFIncludes 10% overhead and 10% fee
- Mountable curb$18.18 / LFIncludes 10% overhead and 10% fee
- Nonshrink grout place$74.90 / CFIncludes 10% overhead and 10% fee
- Octagon column form$22.13 / LFIncludes 10% overhead and 10% fee
- One-sided wall form$12.81 / SFIncludes 10% overhead and 10% fee
- Oval column form$21.11 / LFIncludes 10% overhead and 10% fee
- Perimeter wall form$17.69 / SFIncludes 10% overhead and 10% fee
- Pier / spread footing place$102.76 / EAIncludes 10% overhead and 10% fee
- Pier cap pour$30.03 / CFIncludes 10% overhead and 10% fee
- Pier footing pour$27.16 / CFIncludes 10% overhead and 10% fee
- Pile cap form set$13.29 / LFIncludes 10% overhead and 10% fee
- Pile cap place$29.07 / CFIncludes 10% overhead and 10% fee
- Pile cap pour$26.96 / CFIncludes 10% overhead and 10% fee
- Pipe encasement$16.49 / CFIncludes 10% overhead and 10% fee
- Place & finish 4" sidewalk$5.94 / SFIncludes 10% overhead and 10% fee
- Place & finish 4" SOG$5.36 / SFIncludes 10% overhead and 10% fee
- Place & finish 5" SOG$6.40 / SFIncludes 10% overhead and 10% fee
- Place & finish 6" SOG$7.45 / SFIncludes 10% overhead and 10% fee